Prepare for the PE Civil Water Resources depth with every number worked.

Find the knowledge area to fix in a free 12-question diagnostic, repair it with a short lesson, then practice with every calculation and unit shown.

The only interactive course with a tutor that finds your weak spots and fixes them.

One payment in US dollars. Full refund within 14 days, for any reason.

Try four questions

Four knowledge areas, at the exam's level. Pick an answer to see every step of the working, units included.

Question 1Energy, continuity and momentum
A 0.30 m diameter water main carrying 0.09 m3/s passes through a concentric reducer into a 0.20 m diameter pipe. The mean velocity in the 0.20 m pipe is most nearly:
Question 2Critical depth, specific energy and jumps
A rectangular channel 12.0 ft wide carries 180 cfs. Use g = 32.2 ft/s2. The critical depth is most nearly:
Question 3Runoff: rational and curve number methods
A watershed with a curve number of 78 receives a 24-hour rainfall of 4.5 in. By the NRCS curve number procedure with S = 1000/CN - 10 (in.), Ia = 0.2S and Q = (P - Ia)2 / (P - Ia + S), the direct runoff depth is most nearly:
Question 4Coagulation and flocculation
Jar tests set the dry alum dose for a 5.0 MGD plant at 30 mg/L. The alum is 100% pure as fed. The alum feed rate is most nearly:

Free tools

The twelve knowledge areas

80 questions in 8 hours of exam time, all from the Water Resources and Environmental depth. On NCEES's July 2026 figures, 71% of first-time takers passed.

Project Planning

Quantity take-off, cost estimates, CPM schedules and float, and present worth and life-cycle cost.

4 to 6 of the 80 questions

Soil Mechanics

Lateral earth pressure, consolidation and compaction, bearing capacity, settlement and slope stability.

3 to 5 of the 80 questions

Materials

Soil classification and boring logs, phase relations, permeability tests, concrete and pipe materials.

4 to 6 of the 80 questions

Analysis and Design

Mass balance, the pounds formula, hydraulic and solids loading, and weirs, flumes and meters.

6 to 9 of the 80 questions

Hydraulics: Closed Conduit

Energy and continuity, Darcy-Weisbach and Hazen-Williams, minor losses, pumps, NPSH and pipe networks.

7 to 11 of the 80 questions

Hydraulics: Open Channel

Manning's equation, critical depth, hydraulic jumps, culverts, gutters, inlets and storm sewers.

7 to 11 of the 80 questions

Hydrology

Rainfall and return periods, the rational and curve number methods, unit hydrographs and detention.

8 to 12 of the 80 questions

Groundwater and Wells

Aquifers, Darcy flow and seepage, flow nets, and steady and transient well drawdown.

4 to 6 of the 80 questions

Surface Water and Groundwater Quality

Mixing below an outfall, BOD, the DO sag, TMDLs and contaminants.

5 to 8 of the 80 questions

Drinking Water Distribution and Treatment

Demand and storage, sedimentation, coagulation, filtration, disinfection, softening and other treatment.

6 to 9 of the 80 questions

Wastewater Collection and Treatment

Flows and lift stations, primary and secondary treatment, activated sludge, nutrients and sludge handling.

7 to 11 of the 80 questions

Project Sitework

Cut and fill, surveying and layout, erosion control, curves, work zone safety and retaining walls.

9 to 14 of the 80 questions

In the course

  • 14 interactive lessons
  • 207 practice questions, every number and unit worked
  • 1 full 80-question mock in two 4-hour halves

See the course

Guides

Civil Engineering License Prep Pro

US$499one payment

  • 14 interactive lessons
  • 207 practice questions with every number and unit worked
  • 1 full 80-question practice exam in two 4-hour halves

Full refund within 14 days. Ask within 14 days of paying, for any reason. Our refund promise still applies after you start the course. The note under the pay button is about the separate legal right to cancel. Terms

By paying you agree to our Terms. Email us within 14 days for a full refund.
Take the free diagnostic first

Apple Pay, Google Pay or card. Charged in USD.
One payment. No sales tax is added. Access until October 31, 2027.